The two phase of the Qinghai Huzhu Barley Wine project has started. The main construction content in this phrase : (1) Use Triaxis H-1 Hardcoat (Standard) to build the new warehouse; (2) Use Triaxis H-2 Hardcoat(Non-Fire) to complete the outdoor shed construction; (3) Use OA-S to repair and renovate the goods warehouse.The engineering period is divided into three stages, totaling a month around.